GM Stage Two Performance For The Supercharged LSJ Ecotec - Power Up
|
Install the battery cable and turn the ignition key to the 'on' position to check for fuel system leaks. If there are no leaks, crank the engine until it starts and let it run for a few minutes. Check the fuel rail again for leaks once everything has come up to operating temperature. With no leaks, shut the engine off and install the engine cover. View Related Article
|
|